| Project title |
Residential Area Project in East Bund Culture Corr |
Cooperation form |
|
|
|
Production scheme
Construction plan
Market analysis
Operation scale
Sales forecast |
◇ Brief Introduction:
This program locates between the Tongtu Road and Min’an Road, reaching to the east of Shuguang Road, west of north Jiangdong Road, covering an area of 9.65 he. It is closely link to Yong River, Binjiang Park. With the development of no.6 light track, it will become the golden area to connect the Jiangdong and Jiangbei district and own its advantage both in location and transportation.
◇ Planed Specifications: (interim)
Plot No Land usage Plot Area
(ha) Building
Density(%) FAR Ratio of Green Space
(%) Height limit
(m) Notes
5-3# R2 2.42 25 2.1 30 60
5-8、9# C2(S3) 2.12 45 3.2 20 60 0.36 ha for parking area.
5-4# R2 2.94 30 2.2 30 60 12 classes for a kindergarten
5-10# R2 2.16 30 2.5 30 80
|
| Equipmentimport,
raw material
supply and so on |
|
| Investment estimate and
cost effectiveness analysis |
Total investment |
|
Registered capital |
|
Annual sales |
|
| Anticipated means of investment from foreign partner |
Annual Profit |
|
| Foreign currency |
Technology |
Equipment |
Brand name |
Others |
Internal return rate(%) |
|
|
|
|
|
|
|
Investment
recovery
period(year) |
|
| Basic
facts of
Chinese partner
(ownership, total assets and
fixed assets,
current products and sales,
current equipment and
technology,
auxiliary facilities and so on) |
|
| Project location and
geographical advantages |
|
| Project status quo |
This area is used for living and factory using and will start to remove within 2007. Prophase negotiation is welcomed. Developments solely or corporately are both under consideration. The program need |
Project
dataavailable |
|
| Organization to contact |
|
Person to
contact |
|
| Address |
|
Postal code |
|
| E-mail |
|
Telephone |
|
| Website |
|
Fax |
|