| Project title |
The Operation and Management of the Shared Trench |
Cooperation form |
|
|
|
Production scheme
Construction plan
Market analysis
Operation scale
Sales forecast |
◇ Brief Introduction:
Upon the completion of this project, services including telecommunication (network is included), power supply, CATV, tap water, heat and mid-sized water pipe can be realized by using only one shared trench, which makes incorporated market-driven operation and management possible. Total length: 10.2 km, 6.5km of which will be finished in first-stage construction; Width (square hole): 4.8m; Height: 3.2m.
Total investment: RMB 165 million; running cost: RMB 15 million.
Revenue sources: charge for use, regular operation revenue and allowances from the government.
|
| Equipmentimport,
raw material
supply and so on |
|
| Investment estimate and
cost effectiveness analysis |
Total investment |
|
Registered capital |
|
Annual sales |
|
| Anticipated means of investment from foreign partner |
Annual Profit |
|
| Foreign currency |
Technology |
Equipment |
Brand name |
Others |
Internal return rate(%) |
|
|
|
|
|
|
|
Investment
recovery
period(year) |
|
| Basic
facts of
Chinese partner
(ownership, total assets and
fixed assets,
current products and sales,
current equipment and
technology,
auxiliary facilities and so on) |
|
| Project location and
geographical advantages |
As the development and construction of the core area of Eastern New Downtown progresses, the revenue from the operation of shared trench will continue to increase. The preliminary design document has been finished, and constructions have started. |
| Project status quo |
|
Project
dataavailable |
|
| Organization to contact |
|
Person to
contact |
|
| Address |
|
Postal code |
|
| E-mail |
|
Telephone |
|
| Website |
|
Fax |
|